Can't is a 4-Letter Word

Never even begin to let the word CAN’T enter your mind or come out of your mouth.

D. Brown Management Profile Picture
Share

Don’t allow your teammates to think or say the word CAN’T.  This is easier said than done. Avoiding CAN’T requires a combination of leadership, discipline and tenacity with a healthy dose of optimism to avoid.

Leadership Tools: Can't is a 4 Letter Word

NOT YET is a much better way to frame things.  

"Most people overestimate what they can do in one year and underestimate what they can do in ten years."

Bill Gates

Bill Gates summed it up perfectly with his quote which is generally about time span. It’s important to understand that all of us have different time horizons over which we are comfortable planning.  

These time horizons shorten based on the newness of the subject matter and what level of stress we are under.

Contractors are faced with lots of new conditions including a very tight talent market, changing project delivery methods and rapidly developing technologies.  

Leadership requires that steady hand of setting the course - even in the face of uncertainty.  Then sticking with that course taking one step forward at a time. Even when you end up falling back two-steps just get back up and take another step forward with a positive attitude.  You will get there; just NOT YET.




Preconstruction - Adding Value from the Perspective of the Project Owner
Finishes and other key design elements are important for both the project owner and architect.  A contractor providing preconstruction services must focus on protecting these throughout the design-development process.
Jack Welch - Any Jerk Short-Term Earnings
The ultimate measure of a leader is how well their business unit performs AFTER they are gone. With the construction industry talent shortages leaders must focus on building other leaders at an accelerated rate just to maintain market position.
Lead Measures and Outcomes: Starting with the Schedule of Values (SOV)
It is nearly impossible for a contractor to have consistently great cash flow if they have a Schedule-of-Values (SOV) that isn’t loaded properly and integrated with the project schedule, including a projection of the cash flow.