Building vs Demonstrating Capability

Building a sustainably growing construction business is a huge challenge for everyone on the team.

D. Brown Management Profile Picture
Share

Building an effective project team across dozens of different companies with sometimes competing interest is incredibly difficult.  

Leadership Tools: Building vs. Demonstrating Capability.

These are daily struggles that leaders and everyone on the team must navigate and LOVE.


Is there a faster way?  A shortcut? An EASY BUTTON?

How did they (reference someone else) get there so fast?  


It’s easy to get caught up asking ourselves these questions too much or worse yet by blaming others on the team including leadership for things being so difficult.  

The elements we see publicly of others are usually either big problems or the demonstration of a capability that has already been built after years of struggle.  When these are put together in media formats such as The Profit or Shark Tank we can begin to think we can go from major problem to solution in 30 minutes!  

Assume that about 95% of your time will be the struggle to build capability whether it is in business or life   and whether it is mental, physical or financial.  

Consider David Goggins and his pull-up record from 2013.  The first couple thousand looked pretty easy (for him) but what we don’t see publicly was the YEARS of training it took to get there including several failed attempts.




Cash Flow and the 5Cs of Credit - Capital
The 2nd of the 5Cs of Credit is how much capital you are putting at risk, along with your financial partner. Contractors should design and follow their own capital management policies appropriate for their business.
Change Tracking Log & Management
Great change management starts with a good tracking system. The far more important part of change management is the rigorous review process at least 2X monthly with your PMs that will limit your risk, increase your opportunities, and train your team.
Clear Installation Information
For a contractor to maximize their labor productivity, they need to start with clear information provided to the crews doing the actual installation. Good information is the first of the six pillars of productivity and means several things: