Lean Principle - Stop Work (Until Problems Are Corrected)

All construction projects will run into some degree of problems.

D. Brown Management Profile Picture
Share

It is how the management team chooses to manage these problems that ultimately determines the outcome of the project.  

Field Productivity: Lean Principle, Stop Work Until Problems are Corrected. Quote: If a project is in trouble and you don't have a workable plan then shut it down until you do. Kiewit Superintendent Training.

The tenacity to keep moving forward, no matter what, is an amazing trait shared by many in construction.  It is what moves projects forward. It is also the trait that will get project teams in massive trouble when the problems reach a tipping point that makes their plan unworkable. 

There is a line of reasoning that says moving forward and continuing to work is what must be done. There is even contract language including liquidated damages that can reinforce this mentality.


 

The automobile industry had the same mentality:

“Never stop the production line - no matter what. It costs thousands of dollars per minute.”

 

Toyota, who is the world’s largest automobile manufacturer, looks at it differently:

“Quality and production are too important. We MUST stop the production line if we are struggling or have a quality failure in any way. That is how we troubleshoot, learn, and improve.”  

Through their Andon system, they empowered everyone to stop production. 


 

It’s a paradigm shift that some of the best and largest contractors like Kiewit have adopted. 

“If a project is in trouble and you don’t have a workable plan then shut it down until you do.” - Advice From Kiewit Superintendent Training


 

Andon and similar policies are to productivity what Stop Work Authority (SWA) is to safety. Many of the adoption challenges are similar including:

  1. Culture
  2. Training
  3. Systems Including Notification, Investigation, and Follow-Through

 

Safety and SWA has some advantages in adoption over production policies:

  1. Easier to align the team around going home safely to their families each day.
  2. Standard measurements such as incident rates.
  3. Direct link to financial impacts with loss ratios and insurance rate modifiers.
  4. Reporting and SWA enforced by regulation.

 

 

 



Related Training
More from D. Brown Management
Leadership and Management of Details
Building a great contracting business requires the right balance of leadership and management. While it is possible to separate them the truth is that many of the top leaders are relentlessly disciplined managers.
The Leadership Vibrancy Curve
Leaders must navigate (1) the stages of contractor growth, (2) the phases of management team development, and (3) the arc of their own career and life. Maintaining the right levels of leadership vibrancy leads to sustainable scaling and succession.
Thriving with a Difficult Manager
In the ideal situation, everyone would have a great manager - both internally and externally. In the real world, we will all have to work for someone we consider a difficult manager. Learn to thrive in these situations.