Project Delivery - Integrated Project Delivery

Integrated Project Delivery (IPD) can be the best method for a project if the culture and competencies of all parties, including the Project Owner, are all aligned.

D. Brown Management Profile Picture
Share

In this project delivery method, the Architect and CM+GC, along with key consulting engineers and key specialty contractors, are all bound by the same contract with the owner. 

CM at Risk: Project Delivery Methods - Definition of Integrated Project Delivery and pros and cons.

Project Delivery - Integrated Project Delivery
The preferred project delivery method. There is a reason 100 of ENR's Top 400 General Contractors use CMAR as the project delivery method for over 75% of their work. Leverage CMAR as part of your growth strategy....

Project Delivery - Integrated Project Delivery
The preferred project delivery method. There is a reason 100 of ENR's Top 400 General Contractors use CMAR as the project delivery method for over 75% of their work. Leverage CMAR as part of your growth strategy....

Lean Principle - Pulling vs. Pushing and the Four Most Powerful Words for Improving Productivity
“What do you need?” are the four most powerful words for improving productivity, developing a team, and building engagement. "Pull-Planning" can be used way beyond building a project. The principle is the foundation for many aspects of life and business.
Lean Principle - Understanding Lean Construciton
Lean is a body of knowledge dating back hundreds of years focused on sustainably growing an organization. During the last 20 years the construction industry has been rapidly adopting some of these tools to improve productivity.
Last Planner System (LPS) Overview: Should > Can > Will > Did > Improve
The Last Planner System (LPS) developed by the Lean Construction Institute (LCI) is the codification of the practices used by the best project teams. There are elements that EVERY contractor can use to improve performance of their projects and business.