Change Orders and Average Cost Impact to the Project (Industry Survey)

Changes are a part of the construction process with many underlying causes.

D. Brown Management Profile Picture
Share

While we have all heard the average of 10% changes on construction projects, it is interesting to look at an industry study for validation.  

Change Management: Project Changes, state of the industry survey.

This study by HBRC categorized the range of contract changes and the percent of projects within that range. The average is 10% and none of the projects had 0% changes.  

Engaging key contractors to work on the project earlier will lower the amount of changes related to design conflicts while protecting the aesthetics of the design.  

Another interesting part of the study was that 43% of respondents DID NOT have a consistent process for managing changes.  

A rigorous change management process starts at the earliest stages of design development with rigorous weekly reviews.  

During construction, the definition of a change should be broadened beyond what may become a cost issue for the project owner and also managed through a rigorous weekly process such the Last Planner System.  



Related Training
More from D. Brown Management
Leadership and Management of Details
Building a great contracting business requires the right balance of leadership and management. While it is possible to separate them the truth is that many of the top leaders are relentlessly disciplined managers.
The Leadership Vibrancy Curve
Leaders must navigate (1) the stages of contractor growth, (2) the phases of management team development, and (3) the arc of their own career and life. Maintaining the right levels of leadership vibrancy leads to sustainable scaling and succession.
Thriving with a Difficult Manager
In the ideal situation, everyone would have a great manager - both internally and externally. In the real world, we will all have to work for someone we consider a difficult manager. Learn to thrive in these situations.