Weekly Design Meetings and Protecting Finishes

Finishes and other key design elements are important for both the project owner and architect.

D. Brown Management Profile Picture
Share

A contractor providing preconstruction services must focus on protecting these throughout the design-development process.  

Preconstruction Weekly Design Meetings.

If a contractor is only providing basic estimating services throughout design-development, this is what happens:

  • 30% - Budget looks good across the board - everyone is happy.
    Preconstruction: Design at 30% Estimate.


  • 60% - Budget increases in critical systems, including structural and MEP force value-engineering into the finishes because the design is too far along to cost effectively make changes elsewhere.
    Preconstruction: Design at 60% Estimate.
     
     
  • 90% - Budget for finishes is often cut further than the project owner or architect would like, but there are few choices left.  
    Preconstruction: Design at 90% Estimate.

The solution is rigorously managed weekly design meetings facilitated by the contractor and focusing on value-engineering each system throughout the whole design-development process. 

This is just as critical as protecting the overall budget and cash flow of the project

Preconstruction Estimate Summary. Design Development.

CM at Risk
The preferred project delivery method. There is a reason 100 of ENR's Top 400 General Contractors use CMAR as the project delivery method for over 75% of their work. Leverage CMAR as part of your growth strategy....

CM at Risk
The preferred project delivery method. There is a reason 100 of ENR's Top 400 General Contractors use CMAR as the project delivery method for over 75% of their work. Leverage CMAR as part of your growth strategy....

Cash Flow and the 5Cs of Credit - Collateral
The 4th of the 5Cs of Credit is how much and what type of collateral the contractor will put up as a guarantee. The collateral requirements change significantly as contractors grow.
Cash Flow Myth 3 - Having Enough Capital
We have enough capital to not worry about Cash Flow. From the time this type of thinking starts to permeate the organization it is just a matter of time before there will be a cash flow crisis.
Project Delivery - Integrated Project Delivery
Integrated Project Delivery (IPD) can be the best method for a project if the culture and competencies of all parties, including the Project Owner, are all aligned.