Project Delivery - Design-Bid-Build

The Design-Bid-Build (DBB) method of project delivery is easily the most familiar to owners, architects and contractors.

D. Brown Management Profile Picture
Share

No contractor should ever lose their ability to compete, win, and build profitable projects using this method of delivery. It keeps your estimating and operations teams sharp.

CM at Risk: Project Delivery Methods - Definition of Design-Bid-Build and pros and cons.

In this method, the project owner contracts separately with the architect for design and a single prime contractor for construction.  

  • It is the primary procurement method used for public works projects.
      
  • Due to the sequential design followed by the construction workflow, it has the longest timeline.

  • Contractors are typically forced into a competitive bidding situation, resulting in a low initial construction cost.

  • Because the contractors were not involved in the design phase, there are frequently cost and schedule overruns that sometimes end in litigation.  

The negatives must be weighed against the positives for this project delivery method. In many cases this is absolutely the right method for the project.


More from D. Brown Management
Leadership and Management of Details
Building a great contracting business requires the right balance of leadership and management. While it is possible to separate them the truth is that many of the top leaders are relentlessly disciplined managers.
The Leadership Vibrancy Curve
Leaders must navigate (1) the stages of contractor growth, (2) the phases of management team development, and (3) the arc of their own career and life. Maintaining the right levels of leadership vibrancy leads to sustainable scaling and succession.
Thriving with a Difficult Manager
In the ideal situation, everyone would have a great manager - both internally and externally. In the real world, we will all have to work for someone we consider a difficult manager. Learn to thrive in these situations.