Lean Principle - Stop Work (Until Problems Are Corrected)

All construction projects will run into some degree of problems.

D. Brown Management Profile Picture
Share

It is how the management team chooses to manage these problems that ultimately determines the outcome of the project.  

Field Productivity: Lean Principle, Stop Work Until Problems are Corrected. Quote: If a project is in trouble and you don't have a workable plan then shut it down until you do. Kiewit Superintendent Training.

The tenacity to keep moving forward, no matter what, is an amazing trait shared by many in construction.  It is what moves projects forward. It is also the trait that will get project teams in massive trouble when the problems reach a tipping point that makes their plan unworkable. 

There is a line of reasoning that says moving forward and continuing to work is what must be done. There is even contract language including liquidated damages that can reinforce this mentality.


 

The automobile industry had the same mentality:

“Never stop the production line - no matter what. It costs thousands of dollars per minute.”

 

Toyota, who is the world’s largest automobile manufacturer, looks at it differently:

“Quality and production are too important. We MUST stop the production line if we are struggling or have a quality failure in any way. That is how we troubleshoot, learn, and improve.”  

Through their Andon system, they empowered everyone to stop production. 


 

It’s a paradigm shift that some of the best and largest contractors like Kiewit have adopted. 

“If a project is in trouble and you don’t have a workable plan then shut it down until you do.” - Advice From Kiewit Superintendent Training


 

Andon and similar policies are to productivity what Stop Work Authority (SWA) is to safety. Many of the adoption challenges are similar including:

  1. Culture
  2. Training
  3. Systems Including Notification, Investigation, and Follow-Through

 

Safety and SWA has some advantages in adoption over production policies:

  1. Easier to align the team around going home safely to their families each day.
  2. Standard measurements such as incident rates.
  3. Direct link to financial impacts with loss ratios and insurance rate modifiers.
  4. Reporting and SWA enforced by regulation.

 

 

 


Lean Principle - Stop Work (Until Problems Are Corrected)
Field labor is the often the biggest variable on a construction project - making it the biggest risk and opportunity....

Related Training
Lean Principle - Stop Work (Until Problems Are Corrected)
Field labor is the often the biggest variable on a construction project - making it the biggest risk and opportunity....

5-Step Foreman Coaching Outline
Accelerating the development of foremen is one of the most critical things a contractor can do to improve project outcomes and mitigate the craft labor shortage. This 5-step outline will form the foundation of a great coaching program.
Continuous Improvement: Plan, Do, Check, and Act (PDCA)
Improving productivity in construction is exceptionally challenging. It must be embraced as a journey and not a destination. It must be made into a game so that people clearly see what winning looks like and fall in love with the process.
The Six Pillars of Task Productivity in the Field
Contractors can guarantee labor productivity on their projects by leading their project teams to focus relentlessly on ensuring that these 6 Pillars of Productivity are supporting each task on the job site.