Four Critical Elements of an Effective Task

Maximizing labor productivity starts with defining exactly what needs to be delivered.

D. Brown Management Profile Picture
Share

Once you define what needs to be delivered (your scope, contract, specs, and plans) in order to maximize labor productivity, it then needs to be broken down into tasks that can be effectively managed.

Field Productivity: Breaking a Project into Manageable Tasks Sets the Foundation for Productivity (1) A clearly defined element of work that can be completed without interruption if all prerequisites are fully met before starting. (2) Task description aligns with the way a crew would be laid-out in the field. (3) Hours and costs as estimated and as planned are known.  (4) Progress can be quickly and accurately estimated by anyone with reasonable field knowledge during a job walk.

We look at four criteria when it comes to defining what an “Effective Task” looks like:

  1. It is a clearly defined element of work that can be started and completed WITHOUT interruption if all prerequisites are met before starting.  
  2. The task description makes sense to anyone with basic trade knowledge aligning with how crews would actually be laid out in the field. When laying out a journey-level craftsperson in the field, the task would not reasonably be broken into smaller tasks.  
  3. Hours and costs to complete the task as estimated and as planned are known, including what is remaining for field layout and installation after design in virtual construction and fabrication if applicable.
  4. ANYONE with reasonable trade knowledge would be able to QUICKLY assess the quantifiable status of the task during a job walk in terms of percent complete or estimated hours remaining to complete.

Do your job cost reports show effective labor curves? Smooth ramp-up to full production then ramp-down is the most desirable at the task, phase, scope, and project levels. The degree to which this can be achieved has a direct impact on safety, quality, and productivity. 

While breaking the the project down into these tasks, the team must rigorously discuss the most effective sequencing, what could be prefabricated or kitted, what is required to be ready before the project starts, and all the other six pillars of task productivity.

Tasking at the beginning of the project ties into Short-Interval-Scheduling (SIP), tracking those via Percent Planned Complete (PPC), and using them daily with ABC Daily Planning.


Learn more in our Labor Productivity Workshop, including how it can be tailored for your company.

All relationships begin with a simple conversation - let's schedule time to talk about how we have helped contractors set up effective "Award-to-Start" systems and develop Foreman Training/Coaching programs. 



Related Training
More from D. Brown Management
Leadership and Management of Details
Building a great contracting business requires the right balance of leadership and management. While it is possible to separate them the truth is that many of the top leaders are relentlessly disciplined managers.
The Leadership Vibrancy Curve
Leaders must navigate (1) the stages of contractor growth, (2) the phases of management team development, and (3) the arc of their own career and life. Maintaining the right levels of leadership vibrancy leads to sustainable scaling and succession.
Thriving with a Difficult Manager
In the ideal situation, everyone would have a great manager - both internally and externally. In the real world, we will all have to work for someone we consider a difficult manager. Learn to thrive in these situations.